Setting a realistic fitout budget
A fitout budget built on a per-square-metre rule of thumb rarely survives contact with a real scope. Here's how to build one that does.
22 September 2026
Rules of thumb break first
A per-square-metre rate is a starting point, not a budget. It ignores the things that actually drive fitout cost: the condition of the premises, the level of finish, services upgrades, and the approvals pathway.
Build the budget from the scope
- Base building — what the landlord provides and what you must add
- Services — mechanical, electrical, hydraulic, fire, data
- Finishes and joinery — the level of finish your concept needs
- Approvals and certifications — DA, CDC, fire, access, food authority
- Contingency — a realistic allowance, not a round number
Pressure-test it early
The cheapest moment to fix a budget is before design is finalised. Once drawings are detailed, every change costs more to unwind.
Keep a contingency you trust
A fitout budget without a proper contingency is a budget that will be broken. Hold one, and manage it against the scope as design develops.
This article is general guidance and not a substitute for advice tailored to your premises, documents and circumstances.